To fit for the new technologies on electric furnace
steel-making, to increase furnace bottom stability, to fully utilize
the operation capacity of the electric furnaces, to increase the
service life of the electric furnace bottom & break slope &
break the limit of 1500 campaigns for the Eighth Five-Year-Plan
on science & technology development, out company produces the
MgO-CaO-Fe2O3 based synthetic "XP Xinrong
Brand" MGF-82 electric furnace bottom & slope ramming material
using internationally advanced batch composition design & scientific
production technology. The electric furnace bottom & slope will
be rammed up to your satisfaction when you use this product &
follow this operation manual.
1.The product's physical
& chemical specification:
Items
|
Specification
|
MgO (min.)
|
82
|
CaO
|
7-9(6-9)
|
Fe2O3 (Max.)
|
5-7(5-9)
|
SiO2 (max.)
|
1.5
|
Crushing strength, MPa
1300℃*3h(max.)
1600℃*3h(min.)
|
10
25
|
Linear Shrinkage Rate,
% 1300℃*3h(max.)
1600℃*3h(min.)
|
10
25
|
Bulk Density(2-5mm) g/cm3 (min.)
|
3.25
|
Size Distribution mm
|
0-5
|
2. Properties
Main Usage: Making of electric furnace bottom
& slope
Maximum Refractoriness: 1800℃(SK-40)
Operation Consumption: about 2800 kg/m3
Operation Method: Dry Ramming
3. Special Features
(1). This product is a kind of monolithic refractory
material. Therefor it is not limited by the furnace mode or the
size. It can fit for the usage on bottom & slope in each grade
of high power electric furnace(HP), super high power electric furnace
(VHP) & direct currency electric furnace (DC) etc.
(2). This product is made of high grade MgO-Cao-Fe2O3
based synthetic raw material. Its size distribution structure
is scientifically calculated & controlled. The product therefor
has the features of reliable quality, quick sinter, high refractoriness
& slag resistance.
(3). It is easy to operate. It doesn't complicated
operation machinery or special trained technician.
(4). Since the product is a dry-ramming material,
it doesn't need to heat-up or to add water for operation. Just to
press the material to firmly solid according to the shape of the
furnace bottom & slope, then it is workable.
(5). The product is free from poison & smacks.
It does not contain any composition which may be a harm to steels.
4. Operation Method:
(1). Prepare enough ramming material according
to the size of the furnace bottom. Moistured material is not allowed
to use. Other material is not allowed to be added in. Get ready
pneumatic hammers & measure-use rulers. Get ready steel sticks
(?mm) for ramming quality inspection.
(2). Clean the permanent lining brick layer.
Expose the bricks well. When operation on the original working lining
layer, residual materials on the surface be cleared away.
(3). Total ramming thickness is not less than
470-500mm, Ram one layer after the other. Each layer be about 120mm.
Use pneumatic hammers for spiral ramming or use crane-hanged iron
to press firmly.
(4). Harrow 20mm cross or X shape grooves on
the surface of each finished ramming layer, then input the layer
or ramming material & press firm. This makes a good combination
of the two layer. (Special attention shall be paid to press the
edges firmly solid).
(5). After the ramming is finished, take out
the mold plates carefully. Levering is absolutely forbidden. Then
trim to curve shape according to the measurements of the furnace
slope.
6. Usage &
Maintenance
(1). To protect the furnace bottom & slopes,
they shall be completely covered with thin steel plates for the
first melting service after bottom & slope construction operation.
(2). For the first melting service campaign,
charge falling compact shall be reduced as much as possible. Heavy
material impact is strictly prohibited.
(3).For the first melting service campaign, lime
is not to be added to the furnace bottom; Oxygen is not to be blew;
natural melting is assumed; iron ore is not to be added for oxidation;
less or no cast iron is to be fed; reduction time is stretched longer;
operate electricity shall be low in voltage & low in currency.
(4). For the first three campaigns, feed with
residual liquid steel. This is good to keep the temperature.
(5). When pits are coming out from the furnace
bottom after a long period of service time, blow the pits with compressed
air first, then throw ramming maternal to the cleaned pits (better
be pressed firm by crane-hanged iron).
Address: Pailou Town, Haicheng City, Liaoning
Province, China.
Postcode: 114207
Tel: +86 412 6103901
Fax: +86 412 3779797
E-mail: sales@chinarefractories.com
Copyright (C) 1999-2016, China Haicheng City Rongli Magnesia Co.,Ltd.
All rights reserved. Back Home
|